January 21st, 2010    Carport All, Project Case Studies | 2 Comments »         

Repeat Customer, Vanguard Energy Partners recently completed the Installation of this 84.24 Kw elevated solar, roof mounted system.

The structural steel package was designed to connect to existing building structure at column location with a span grid of 40′ x 25′ in order to minimize additional load impact to existing structure.

The elevated solar roof mount pv system  was developed and installed by Vanguard Energy partners , engineered and fabricated by Carport Structures Corp.

62 JOSEPH ST 8-19-09 S-1 TO S-4

Tags: , , , , ,

Freightliner M2

January 17th, 2010    Carport All, General | 3 Comments »         

The recently commissioned Freightliner M2 is the newest addition to the Carport Structures fleet. The bed rack has been configured with adjustable pick outriggers to allow for easy access to standard height carports as well as taller canopies and elevated solar structures.

The M2 is completely outfitted and can easily mobilize a crew of 5 anywhere in the U.S.

Tags: , , ,

Northwest Bergen County Utility Authority

January 11th, 2010    Carport All, Project Case Studies | 1 Comment »         

Designed in partnership with Vanguard Energy Partners the structural steel package consists of hot rolled shapes and cold formed light gage components in order to provide and custom prefabricated structure and solar racking system that would take full advantage of the existing walk ways in order to eliminate the need for additional foundations. The elevated solar shade structure “solar carport” provided the necessary square footage for the installation of the 334 kw PV system.

Solar project developed and erected by  Vanguard Energy Partners.
Structural steel engineered and fabricated by  Carport Structures Corp.

Tags: , , ,

Voigt & Schweitzer hot dip galvanizing facility

January 10th, 2010    Carport All, Project Case Studies | 1 Comment »         

In 2008 Carport Structures Corporation in alliance with NorAm Service Group and Koerber Construction, completed the rebuild / renovation of the 45,000 sq ft galvanizing facility.  Challenges included the designing of an entirely new roof structure that would utilize existing columns as well as a complex work schedule that would allow for continued production for the galvanizer.

Services Provided include :  design, engineering, detailing, dismantle & demolition, fabrication and erection.
Duration of Construction:  45 days.

http://www.carportstructures.com/photogallerydetails.php

Tags: , , , ,

Morristown Waste Water Treatment Plant

January 8th, 2010    Carport All, Project Case Studies | 2 Comments »         

This 578 kw solar power plant consists of both ground mounted and roof mounted arrays as well as a custom designed elevated shade structure that was retrofitted to the existing water treatment tanks. The tank canopy  ”solar carport”  was configured using structural steel and gage steel components in order to optimize spans.

http://www.carportstructures.com/photogallerydetails.php

Tags: , , , , ,