Phase 1 completed in early March 2012 consists of a 206.8 kw solar carport structure configured as head to head shaded parking with racking ready to receive 896 sharp230 solar panels louvered 10ยบ fixed tilt. Phase 2 schedules for later 2012.
Project developed by 3rd Rock Systems.
Carport systems designed by Noram Service Group.
Fabricated and installed by Carport Structures Corporation.
Watch for future post of the completed project.






