Project Post: St. Peters University Hospital, How Lane Site

How Lane is the first of four parking lot locations at St. Peters University Hospital in New Brunswick, NJ to receive a solar integrated shaded parking structure. Commonly referred to as an elevated solar structure or area cover, these Multi Lane fixed tilt louvered type structures are erected over car spaces as well roadways to maximizes the solar capacity.

Project developed by Sun Farm Network.
Solar carport system designed by Noram Service Group.
Fabricated and installed by Carport Structures Corp.

Project Post: Atlantic County Criminal Court

Phase 1 completed in early March 2012 consists of a 206.8 kw solar carport structure configured as head to head shaded parking with racking ready to receive 896 sharp230 solar panels louvered 10º fixed tilt. Phase 2 schedules for later 2012.

Project developed by 3rd Rock Systems.
Carport systems designed by Noram Service Group.
Fabricated and installed by Carport Structures Corporation.

Watch for future post of the completed project.

Project Post: Wyndham Hotel

This 756kw Solar Carport was completed in December 2011. The entire system consists of 10 independent single post, cantilever type solar carports. The structural steel carports are configured at a 5º fixed tilt and included our typical Z rack.

Project developed by SolarMax Technologies
Carport systems designed by Noram Service Group
Fabricated and installed by Carport Structures Corp.

Special thanks to Jim D and the M2 Crew.

Project Post: The Landings – Garage Port

South Haven MI, Jim and the crew wrapping up on this old school 10 car Mansard style Garage Port. When finished the garage port shell will be set to receive (10) 8 x 7 overhead doors.

Project Post: PC Treasures

In alliance with Noram Service Group and DM Contracting we recently completed fabrication and installation of this arched roof structure covering the future entry way at PCT Head Quarters in Auburn Hills MI.

Project Post: Chasco Construction

Recently completed 8,500 square foot cantilever type carport in Georgetown Texas.

Glynn County State Patrol Office

This 28′ x 147′ Even Gable roof carport roof stands 14′ tall and  was designed with a ladder column type in order to provide more room for angle parking. The photos show one of the Carport Structures installation crews at work erecting the structure.

Mandelbaum & Mandelbaum

Repeat Customer, Vanguard Energy Partners recently completed the Installation of this 84.24 Kw elevated solar, roof mounted system.

The structural steel package was designed to connect to existing building structure at column location with a span grid of 40′ x 25′ in order to minimize additional load impact to existing structure.

The elevated solar roof mount pv system  was developed and installed by Vanguard Energy partners , engineered and fabricated by Carport Structures Corp.

62 JOSEPH ST 8-19-09 S-1 TO S-4

Voigt & Schweitzer hot dip galvanizing facility

In 2008 Carport Structures Corporation in alliance with NorAm Service Group and Koerber Construction, completed the rebuild / renovation of the 45,000 sq ft galvanizing facility.  Challenges included the designing of an entirely new roof structure that would utilize existing columns as well as a complex work schedule that would allow for continued production for the galvanizer.

Services Provided include :  design, engineering, detailing, dismantle & demolition, fabrication and erection.
Duration of Construction:  45 days.

http://www.carportstructures.com/photogallerydetails.php

Strath Haven Condominiums

S5030222Stath Haven Condo’s in Swarthmore, PA  was completed in May of 2009.  This site was notable for its variation in elevation. This site characteristic required that the carport roofs to be stepped in order to accommodate the sloping grade. Flat top carports were selected, all steel components were galvanized to provide a maintenance free end product and mini pile foundation were used rather than traditional concrete pier style.